Effective the 3rd of August 2010 construction will begin on the Loomis Road Bridge over the Loomis Drain (350 feet South of Coleman Road). The road will be closed and traffic detoured. Detour Route is as follows: South Bound Traffic - Loomis south to Coleman west to Shepherd south to Battle east to Loomis North Bound Traffic - Loomis north to Battle west to Shepherd north to Coleman east to Loomis. The project is to be oprn to traffic by November 12th, 2010 and project cleanup and restoration to be done in May 2011 if necessary.
Effective the 9th of August 2010 construction will begin on the Woodruff Road Bridge over the Coldwater River (0.2 miles south of Denver Road). The road will be closed and traffic detoured. Detour Route is as follows: South Bound Traffic: Woodruff south to Denver east to Johnson south to Bridge St. west to Woodruff, North Bound Traffic: Woodruff north to Bridge St. east to Johnson north to Denver west to Woodruff. The poject is to be open to traffic by November 12, 2010 and project cleanup and restoration to be done in May of 2011 if necessary.
 
Effective the week of the 16th of August 2010 construction will begin on Isabella Road between Pickard and Baseline Road. The road will be Closed to thru traffic and detoured. Detour Route for Phase 1 is: South Bound Traffic - Isabella Rd. south to Airport Rd. east to Summerton Rd. south to Pickard Rd. west to Isabella Rd. North Bound Traffic - Isabella Rd. north to Pickard Rd. east to Summerton Rd. north to Airline Rd. west to Isabella Rd. The project is to be open to traffic by November 12th, 2010 and project clean up and restoration to be done in May 2011 if necessary.

Effective the week of the 30th of August 2010 construction will begin on Winn Road between Saratoga Springs Drive and Remus Road. The road will be closed to thru traffic and detoured. Detour Route is as follows: South Bound Traffic: Winn south to Remus (M-20) east to Vandecar south to Deerfield west to Winn Rd. North Bound Traffic: Winn north to Deerfield east to Vandecar north to Remus (M-20) west to Winn Rd. The project is to open to traffic by November 12, 2010 and project clean up and restoration to be done in May 2011 if necessary.

 
 
Copyright © 2005, Isabella County Road Commission, All rights reserved.
Site Design and Hosting: Crystal Computer Support, Inc. & The Pixel Pro